If you live in an area of the country that is under nec 2014 the code calls for the rapid shutdown switch to reduce the voltage to 30 v within ten seconds of all conductors leaving the ten foot boundary of the array.
Nec solar panel requirements.
Exposed non current carrying metal parts of pv module frames electrical equipment and conductor enclosures must be grounded.
It also added few more details such as clarifying that this requirement does not apply to stand alone ground mounts.
Solutions for 2017 2014 and 2011 nec solar labeling requirements.
These drawings based on 2011 nec 690 requirements and contents on the 03 500 pack.
Nec 2017 690 12 b 2 nec 2017 changed the distance of the array boundary from 10 to 1 and inside the building from 5 down to 3.
2011 labels and placards for the nec requirements.
Section 690 of the nec solar photovoltaic pv systems includes all information regarding solar systems.
National electrical code nec 690 defines electrical safety requirements for pv systems.
690 12 is the part of the nec that specifies the rapid shutdown requirements.