Fasten drip edge on eaves with.
Nailing pattern for roof felt.
Setting the roll and then nailing off.
I like to give them a call about any new nailing schedules that i m uncertain about.
Nail metal drip edge flashing which bends over the roof and down the edge of the facing board on all roof edges.
Roll out the felt toward the other end of the roof.
Rafter or roof truss to top plate table and section 2308 7 5 3 10 common 316d box 410d box 43 x0 131 nails 4 3 14 gage staples 7 16 crown toenail c 7.
Valley ridges and hips should have a 6 inch overlap of paper.
Pick up the roll with both hands.
Pay careful attention to roll the felt out smoothly avoiding wrinkles as you move across the roof.
X research source small sheds usually require about 100 to 150 clout nails.
Anchor the top corner of the felt after it has been properly positioned and roll the felt out across the roof.
Contact roofhelp 12 24 nailing pattern for roofing felt each row of nails that are 24 on center should be approximately 12 from the outside edge of the roll.
Be sure that there are no wrinkles.
From behind the roll reach over and nail down the top of the strip with roofing nails spaced 6 to 8 inches apart.
Bsd 321 handout fastening schedule.
Contact roofhelp 9 18 nailing pattern for roofing felt each row of nails that are 18 on center should be approximately 12 from the outside edge of the roll.
Installing roof felt is a two person job.
This video walks through the very basic steps for installing tarpaper felt.
Most of the time you ll need to contact a local building inspector directly to get a definite answer if it s not already written out for you on the blueprints or manufacturers specifications.
Starting a roof with tarpaper felt.
This way i don t get chewed out by the building inspector when they show up to inspect that particular.
The paper should then be nailed in or stapled every three to four inches across.
The top edge of the felt should be nailed no less than every eight inches.
All nails and staples should be placed on the lower half of the paper.
Pull straighten and align the felt along the eaves.
Nail the middle and bottom of the felt similarly.